Nuclear energy now looks like a dud for South Africa

nuclear-news

radiation-sign-sadStudy pours cold water on South Africa’s nuclear build plan BUSNESS DAY LIVE, BY CAROL PATON, 19 APRIL 2013, NEW National Planning Commission (NPC) modelling of South Africa’s energy demands says nuclear power should be delayed by years, and an immediate commissioning of flag-S.Africanew gas-generation capacity should take place to avoid rolling blackouts in the near future.

The remodelling commissioned by the NPC signals the start in earnest of what will be a highly contested policy debate: whether South Africa needs and can afford nuclear power or not, and by when.

The implication of the modelling is that no new nuclear power would be required before at least 2029, but more likely as far away as 2040 if demand grows as expected.

View original post 468 more words

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s